University of Auckland - Science Centre

Building 302 is the University of Auckland’s new science centre. It is a purpose built, 11 storey, 22,500m2 building.


The existing buildings remained occupied during demolition and throughout construction, requiring intricate staging plans.

asBuilt were engaged to by a BIM Manager at Fletcher Construction during the construction phase of the project. asBuilt’s role was to aid in the coordination for the management of all model files and storage. Over thirteen BIM models were successfully federated including building services, structural and architectural models in line with project objectives and deliverables. This allowed us to provide all modelling disciplines with a live and up to date co-ordination environment, in person co-ordination meetings and assist the design/construction team to assign issues for resolution. A large education piece on the project was to give the construction team the flexibility to easily view on any PC/iPad app for overall site use.

220422-University-of-Auckland-B302-ISO-Consultants-Model-800x1082
220422-University-of-Auckland-B302-Basement-800x533 220422-UoA-B302-Level-08-Services-800x533

Partners

Fletcher Construction, University of Auckland

Scale

22,500sqm, 11 storey Science Centre

Services

Advise
Manage

Problem

Extremely complex building with MEP modelling required across 13 models and multiple trades.

Solution

BIM management and coordination for all model files including, building services and structural on the new Engineering Building.

Outcomes

  • Improved work flows for identifying and resolving clashes.

  • Savings for all shareholders in time and costs.

  • Proven quality record, structure was built with 15mm of BIM designed model.